Project Overview

This major installation involved the design, engineering, and manufacturing of a custom 50-Ton Double Girder Overhead Crane for one of the region's largest steel manufacturing plants. The client required a robust, continuous-duty lifting system capable of handling molten metal and massive steel coils in extremely high temperatures and harsh environmental conditions.

SASI ENTERPRISES deployed a team of elite structural engineers to customize the span, hoisting speed, and bridge travel mechanisms. We integrated state-of-the-art Variable Frequency Drives (VFD) for precision control and anti-sway technology to guarantee maximum operator safety during heavy material transit.

Project Goal

Goal Image

The primary objective of this project was to completely modernize the client's heavy material transit workflow, drastically reducing bottleneck times in the steel cooling sector.

  • Design for ultra-high temperature operations
  • Minimize load sway for operator safety
  • Ensure 24/7 continuous duty cycle (A7/A8 class)

Project Challenge

Challenge Image

The primary challenge was installing this massive crane system within an actively operating steel plant without causing significant downtime to the client's production schedule. Our installation team worked in strategic overnight shifts, executing the precise hoisting of the bridge girders using heavy-duty mobile cranes.

Through rigorous planning and flawless execution, the entire 50-Ton system was fully assembled, load-tested, and commissioned three days ahead of schedule, completely exceeding the client's expectations.